Galveston Island Repairs, Remodels and Historic Home Work

No other city we serve has building history like Galveston’s. The island has six historic districts and one of the largest collections of 19th-century buildings in the country. They include the East End Historic District (463 buildings along Broadway and Market), the Silk Stocking district of homes built from the Civil War through World War II, and the Victorian commercial blocks of The Strand. After the 1900 hurricane nearly wiped out the city, Galveston built its 17-foot seawall. Hurricane Ike made landfall on the island in September 2008. The West End, west of where the seawall ends, has no seawall protection at all.

Historic districts: approval before the permit

If your home is in a historic district, exterior work generally needs a Certificate of Appropriateness before the building permit is issued. Many projects can be approved by staff, such as minor repairs, most fencing and rear decks. Moderate exterior repairs or replacing architectural features go to the Landmark Commission. Applications in historic districts need photos of the existing structure and drawings of the proposed changes. We match profiles, materials and details to Galveston’s Design Standards for Historic Properties instead of swapping in whatever the supply house has in stock.

When Galveston requires a permit

Galveston’s Building Division says that if a project’s value is $500 or more, you’ll typically need a permit. Value includes all labor and materials, even donated ones. Paint, new finished flooring, cabinets and interior trim are examples of work that doesn’t need a permit. Once issued, permits have to be displayed so they’re visible from the street, and an approved set of plans has to stay on site. Otherwise the city can issue a red tag with a minimum $50 fee. The city builds to the 2021 International codes and the 2023 NEC. New structures need an elevation certificate, and beachfront construction is governed by separate dune-protection rules.

Official page: Galveston Building Codes & Permitting

Windstorm and salt air

The whole island is in the TWIA designated catastrophe area. Roofing, windows, doors and structural work generally have to be inspected and certified by the Texas Department of Insurance for TWIA coverage. Salt air speeds up corrosion, so fasteners, connectors and exterior finishes need to be chosen for a marine environment.

Galveston projects we take on

Galveston FAQ

Do I need a permit to repaint or replace cabinets in Galveston?

No. The city lists paint, finished flooring, cabinets and interior trim as examples that don’t need a permit. In a historic district, though, exterior color or material changes may still need review.

How do I know if my home is in a historic district?

Call the city’s Development Services/Historic Preservation staff before planning exterior work. We check this on every Galveston bid.

Is windstorm certification required on the island?

For TWIA eligibility, yes. All of Galveston County is in the designated catastrophe area.

Call 832-304-0636 to talk about your Galveston property, or contact us. Nearby: Dickinson, Kemah, League City.